Water and Wastewater Industry
Case Histories

 

 

Simsbury, CT: New Technology Enhances Data Monitoring & Reduces Community Energy Bill
Schneider Electric automation and control solutions help propel this 2.2 MGD facility into real-time data tracking that provided significant energy savings. New equipment also features an Eimco® oxidation ditch. >Read more...

   

Enhanced operations for automated pumping processes
Cape Fear Public Utility Authority uses the award-winning Modicon M340 PAC in 31 pumping stations to control automated pumping processes. A customer tells the story about product reliability, easy installation, and maintenance. >Read more...

   

Creating State-of-the-Art Water Treatment Plants
With the help of new controls and monitoring additions, the wastewater treatment plant of Delaware, OH increased efficiency and capacity.
>Read more...

   

Xantrex inverters used in water district solar energy system in California
The system will provide 2.1 million kWh of electricity per year for the water district, offsetting up to 20% of the electricity required by its largest pumping station. >Read more...

   

Lake Alfred, FL: Ethernet Technology Saves Money, Improves Plant Performance
The city of Lake Alfred, Fla. faced a dilemma — the town was planning to build 11 new subdivisions and was facing new regulations from the Florida Department of Environmental Protection. With an entire citywide operating budget of $12.3 million, how could it afford a crucial wastewater plant upgrade? >Click here to view; right-click to download.

   

Award-Winning Water: CLCJAWA Case Study
In 2005, the Central Lake County Joint Action Water Agency (CLCJAWA) was awarded the Phase IV Drinking Water Excellence Award by the Partnership for Safe Water. This transformation, however, didn't happen overnight—taking more than a decade of collaboration, planning, construction and upgrading to achieve this status. >Click here to view; right-click to download.

   

Wastewater Treatment Facility Upgrade: City of Palm Coast, FL
Expand and upgrade the existing wastewater treatment facility for the city of Palm Coast, FL to accommodate the municipality's rapid population growth.
>Click here to view; right-click to download.

   

South Carolina City Finds Value in a Unified Power and Automation System Offering
In the small suburban community of Easley, South Carolina, Easley Combined Utilities (ECU) embarked on a 20-month expansion plan to upgrade their facility to 12 million gallons per day (MGD) and bring the plant from being completely manual to fully automated.
>Click here to view; right-click to download.

   

System monitors city’s entire water & wastewater treatment facilities
Integrated CitectSCADA system simplifies site monitoring and enables city to reduce training costs, easily integrate cost-effective security devices and link to other systems, such as CMMS and LIMS.
>Click here to view; right-click to download.

   

Advanced Water Wastewater Treatment
Schneider Electric provides controls for the Mandarin, Florida, multimillion dollar water wastewater treatment facility.
>Click here to view; right-click to download.

   

PLC provides new technology to water treatment plant
Upgrade current municipal water treatment facility to a more reliable system and provide local control to each lift station.
>Click here to view; right-click to download.

   

City of Hamilton cleans more water
Schneider Electric provides a complete power and automation solution, including local support, training, and start-up for the PLCs, drives and power monitoring system. >Click here to view; right-click to download.

   

Schneider Electric provides fast service to replace damaged equipment at West Virginia American Water
The new VFD was onsite within days of ordering; using the existing enclosure ensured quick, cost-effective installation.
>Click here to view; right-click to download.

   

Automation and control of a groundwater-based municipal water system
Schneider Electric SCADA system supports second largest ground water system in the United States - City of Fresno.
>Click here to view; right-click to download.

   

Ontario Clean Water Agency uses Powerlogic® solution to prepare for deregulation
Through their Project Management Organization, Square D / Schneider Electric supplied Ontario Clean Water Agency with an embedded gateway system solution for over 30 different water and wastewater treatment facilities in Ontario.>Click here to view; right-click to download.

   

Ethernet TCP/IP communications control City of Holland water treatment plant
Control system relies on powerful Schneider Automation
controllers programmed graphically using function blocks, Ethernet control network, and PC HMIs arrayed as independent network nodes.
>Click here to view; right-click to download.

   

RTU SCADA system replaced by open PLC solution
Annual maintenance costs are significantly reduced and the update time of the network is improved by 700%. >Click here to view; right-click to download.

   

Water monitoring and control system cuts power costs
The use of remote power metering combined with remote control results in more complete operational information.
>Click here to view; right-click to download.

   
AccuSine® Power Correction System reduces harmonic current distortion
Harmonic control ensures system integrity at wastewater treatment plant.
>Click here to view; right-click to download.
   

 

 

 

 

  Copyright Schneider Electric. All Rights Reserved.